Kyd Brook C.S.O

Kyd Brook

London, Bromley, United Kingdom

This location is within Crofton Woods and very near the old gate post that remains from the Fever Hospital which was once there but no longer, it is just the gate post, bits of a path and some walls.
There is a combined sewer overflow (C.S.O) a little upstream from this location that is underground, this is the first easily accessible location to carry out water testing. The C.S.O discharges untreated sewage into Kyd Brook normally during heavy rain. There is an event duration monitor in place that can be looked at online via Thames Water. The brook is usually shallow and runs gently unless there is heavy rain, then it can be deep and flow rapidly.

Location created by
Kirsty Blackman

Latest photos

View all photos

Kyd Brook : Kyd Brook C.S.O

Observed on
2024-12-11

Last discharge from combined sewer overflow was on 7/12/24 from 10am -11am =1hr

Kyd Brook : Kyd Brook C.S.O

Observed on
2024-11-26

The event duration monitor showed that raw sewage discharged into Kyd Brook a little further upst...

Kyd Brook : Kyd Brook C.S.O

Observed on
2024-11-12

C.S.O ( combined sewer overflow) which discharges raw untreated sewage into Kyd Brook, just ahead...

Kyd Brook : Kyd Brook C.S.O

Observed on
2024-10-29

There is a known C.S.O (combined sewer overflow) a little further upstream from this testing site...

Kyd Brook : Kyd Brook C.S.O

Observed on
2024-10-09

Known C.S.O upstream from this sample site. Last discharge 1st October 2024 from 18:00 - 19:45 =...

Kyd Brook : Kyd Brook C.S.O

Observed on
2024-09-25

Known C.S.O ( combined sewer overflow) a little further upstream from this point, the E.D.M (even...

Kyd Brook : Kyd Brook C.S.O

Observed on
2024-09-12

The E.D.M from Thames water states that the C.S.O a little upstream from this testing site last d...

Kyd Brook : Kyd Brook C.S.O

Observed on
2024-08-27

Kyd Brook : Kyd Brook C.S.O

Observed on
2024-08-15

E.D.M showed that the last discharge of untreated sewage into Kyd Brook happened on 1/8/24 from 1...

Kyd Brook : Kyd Brook C.S.O

Observed on
2024-07-29

There is an E.D.M event duration monitor at this site because there is a combined sewer overflow ...