About

Bailey Creek at 3 locations : before Bailey Creek merges with Kennansville Creek, downstream of the merge of the two creeks (downstream of the location of the proposed Storm water pond for the Colgan development). The last location is further downstream where municipal drains enter Bailey Creek- this location is also the location of a proposed outfall from a WWTP (Waste Water Treatment Plant) for the proposed Colgan Development.