Stormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority
North Vancouver, British Columbia, Canada
location of MIS-E-01 using zoom on web app. South side of 23rd St. Two large storm drains emerge side by side with a smaller one of 0.2m inside diameter in between (do not monitor the small one). This is the eastern one which is 0.87m in diameter of concrete. Moderate energy location combining Mission Creek with storm drains from Highway #1. Field measured GPS coordinates in NAD83 are -123.0863960, 49.33019138 in Long and Lat, or UTM 495,731E, 5,464,169N Old Salt project site is the flow from W-01 and W-02 combined
- Site ID: MIS-E-01
- Lat: 49.3301705
- Lng: -123.0860998
- Waterbody Type: Unknown
- Timezone: America/Vancouver
Latest photos
View all photosStormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority : MIS-E-01
Observed on
2024-12-07
Turbidity high but unable to read; water appeared black. In-situ (Water Rangers) measurements t...
Stormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority : MIS-E-01
Observed on
2024-11-28
Turbidity less than 14
Stormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority : MIS-E-01
Observed on
2024-11-09
Turbidity <14
Stormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority : MIS-E-01
Observed on
2024-11-07
Turbidity <14
Stormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority : MIS-E-01
Observed on
2024-10-14
Ysi simultaneous reading Turb less than 14 No strips for pH etc
Stormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority : MIS-E-01
Observed on
2024-10-04
Turbidity <14 NTU. YSI measurements taken at same time. 6PPD-Q samples for Tim Rodgers from the c...
Stormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority : MIS-E-01
Observed on
2024-10-03
Turbidity less than 14 Water flow 5.66 sec and 12.5L 5.60 sec and 10L
Stormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority : MIS-E-01
Observed on
2024-09-25
Turbidity slightly less than 14, perhaps 12?
Stormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority : MIS-E-01
Observed on
2024-09-13
Bucket method used. Attempt 1: 20 L @2 seconds Attempt 2: 20 L @ 1.9 seconds
Stormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority : MIS-E-01
Observed on
2024-09-08
Turbidity <14 Sample directly from pipe outflow